About Snug Solutions
Snug Solutions are the makers of PipeSnug. Finish quickly around pipes.
PipeSnug is an innovative product that makes installing pipes easier and replaces the need to spend valuable time and resource ‘making good’ around pipes where they exit the wall.
Quicker, cheaper, and cleaner than mortar, silicone or expanding foam, PipeSnug can be used on any plumbing or construction project. It provides a professional, tidy, air- and water-tight finish to every job.
PipeSnug is used on boiler condensate pipes where they feed into 32 or 40mm pipes from the inside to help prevent freezing. PipeSnug can be used to seal the hole both internally and externally of the building. Our product is also used for standard waste pipes for kitchens and bathrooms.
We currently offer PipeSnug to fit 32 and 40mm pipes. The 110mm/4” version will be available very soon. Other sizes and versions for different applications are also being planned.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.
New UK National Buildings Database.
Building Safety Wiki Interviews
Chief executive of the British Woodworking Federation.
Planning condition discharge in England and Wales
A brief explanation from a building compliance expert, with further links.
Overheating guidance and tools for building designers
Guidance for dealing with element of building fabric control that have increasing importance.
Shading for housing, a design guide
From the Good Homes Alliance and British Blind and Shutter Association.
UK Standard Skills Classification (SSC)
A shared framework for describing skills needs.
Social media ban consultation comes to close
CIOB urges UK Government to consider social media’s role in careers guidance in ban debate.
The latest of eight Skills England apprenticeship units
The addition of battery manufacturing welcomed by ECA with a warning about the risks of fast-tracked apprenticeship units.
Building Control Independent Panel final report
A precis of a key report led by Dame Hackitt with full recommendations and link to the government response.
















